![](https://www.joshuaberardi.com/wp-content/uploads/2024/03/20240323_160158-1024x1024.jpg)
![](https://www.joshuaberardi.com/wp-content/uploads/2024/03/20240323_225813-470x1024.jpg)
After clipping what felt like a hundred wires and soldering points I got the bottom mostly cleaned. Above is a photo of the wiring before I started. The image on the right is halfway through pulling the tubes out. Those metal towers are riveted in along with a few other components. I will have to take this to the shop where I have more tools to get those out.